Building a total of 140,000 square metres of logistics space at the JadeWeserPort freight transport centre (GVZ). As the only deep-water port in the Federal Republic, it serves a steadily growing international demand and offers opportunities that go far beyond the previous ones. Large shipping companies are increasingly ordering ships with a large draught, which can easily berth here regardless of the tide and also find connections to road and rail thanks to direct link. The project with its three large halls is to be completed in stages. The first hall with 31,738 m² is completed and available for rent. Each hall will be equipped with solar panels on the roof. Larger gates allows the loading of bulky freight.
108 865 m²
Možnosť výstavby
29 332 m²
Voľné priestory
2 287 m²
Voľné kancelárie
Budova | Voľný priestor pre development | Skladové priestory k dispozícii | Kancelárske priestory k dispozícii | Celková plocha | BREEAM | EPC | LED osvetlenie | Parkovacie miesta |
---|---|---|---|---|---|---|---|---|
1 | 0 m² | 29 332 m² | 2 287 m² | 31 737 m² | - | - | 0 | |
2 | 108 865 m² | 0 m² | 0 m² | 108 865 m² | - | - | - | - |
Celkom | 108 865 m² | 29 332 m² | 2 287 m² | 140 602 m² | 967 |
km od veľkého mesta
60
Miesta
967
Čerpacie stanice
16
km ďaleko
32
Germany has a highly developed economy, which is the biggest in Europe at €4.32 trillion GDP in 2021, and a per capita GDP of €52,208. Unemployment stood at 2.9% as of mid-2022, one of the lowest rates in the EU. Vehicle manufacturing is a leading industry in Germany, followed by healthcare and electrical engineering. Germany is the largest exporter in Europe. The ‘autobahn’ road network is the world’s third longest highway system and Germany is well-connected to neighbouring countries by highways. It has nine borders: Denmark, Poland, Czechia, Switzerland, Austria, France, Belgium, Luxembourg and the Netherlands.