Adresse

SP15
26010 Castel Gabbiano

P3 Castel Gabbiano

P3, as advisor of Giano Fund, is developing a new logistics warehouse in Castel Gabbiano (CR) with a total GLA of 22,045 sqm, divisible into two independent units. The warehouse will feature a clear internal height of 12 meters.

Espace actuellement disponible

22 045 m²

Opportunités de développement

0 m²

Disponibilités

0 m²

Espace bureau disponible

Bâtiments

Bâtiment Espace de développement disponible Espace d'entrepôt disponible Espace de bureaux disponible Espace Total BREEAM EPC Eclairage LED Places de parking
DC1 22 045 m²  m²  m²  m² Very good A -
Total 22 045 m² 0 m² 0 m² 0 m²

Information clé

  • GLA: 22.045 divisible in two units
  • 12m under beam
  • Capacity Distributed load:50 kN/sqm;
  • Sprinkler system:NFPA
  • Dock Doors:26
  • Level loading doors:2
  • Car parking spaces:58
  • Truck parking spaces:12
  • Truck court depth:32m
  • Lighting LED

The project is located in the municipality of Castel Gabbiano, in the province of Cremona, within the productive heart of northern Italy and adjacent to the Milan metropolitan area.

It enjoys direct access to the A35 (BreBeMi) motorway via the “Romano di Lombardia” tollbooth and is conveniently connected to the Rivoltana Sp 14 and the Sp 185, some of the major routes linking key industrial and commercial hubs to Milan.

The site is approximately 30 minutes from Milan Linate Airport (45 km) and 35 minutes from Milan (50 km), offering excellent accessibility for logistics and business operations. It is also just 15 minutes from the A4 motorway junction, ensuring seamless regional and national connectivity

Parcs voisins

Voir le détail