Kontakt

Adresse


Brauchen Sie mehr Details?

P3 Herkenbosch

Modern Logistics Development in Herkenbosch

P3 Herkenbosch is a state-of-the-art logistics park designed to meet the highest standards of efficiency, flexibility, and sustainability. Upon completion in Q4 2024, the facility will encompass a total leasable area of 62,011 m², combining warehouse, office space, and mezzanine. Strategically located in the province of Limburg, close to the German border, the site offers excellent connections to key European markets, making it an ideal hub for both national and international distribution. With one unit already leased, the final unit is now available and ready for immediate occupancy

Flexible & Efficient Design

The facility is developed with functionality in mind, ensuring smooth operations for logistics, e-commerce, and distribution companies of all sizes. With a modern layout, extensive loading capacity, and generous parking facilities, the design enables seamless daily operations.

Focus on Sustainability

P3 Herkenbosch is developed to achieve a BREEAM “Excellent” certification, reflecting the project’s commitment to sustainable construction and operational efficiency. The facility integrates advanced features to support energy conservation and environmental responsibility:

  • Energy-efficient LED lighting

  • Smart building systems for optimized energy management

  • Sustainable design principles supporting reduced CO₂ emissions

With these measures, the project ensures long-term value and environmentally responsible operations.

A Strategic Gateway

Situated in Herkenbosch, Limburg, the logistics park offers direct access to the German border and major European transport corridors. Its central location provides seamless connectivity to the Netherlands, Belgium, and Germany, making it a highly competitive base for regional and cross-border distribution.

Derzeit verfügbare Flächen

0 m²

Entwicklungsmöglichkeit

35.000 m²

Verfügbare Fläche

3.051 m²

Verfügbare Bürofläche

Gebäude

Gebäude Verfügbare Entwicklungsfläche Verfügbare Lagerfläche Verfügbare Bürofläche Gesamtfläche BREEAM EPC LED Beleuchtung Parkplätze
A 0 m² 35.000 m² 3.051 m² 61.962 m² - - - -
Total 0 m² 35.000 m² 3.051 m² 61.962 m² 411

Wichtigste Informationen

Key Specifications:

  • Dock doors: 53

  • Level loading doors: 5

  • Truck court depth: 45 m

  • Car parking spaces: 495

  • Truck parking spaces: 48

  • Clear height of 12.20 metres

  • Maximum floor load (warehouse): 5,000 kg/sq.m
  • Maximum floor load (expedition): 2,500 kg/sq.m
  • Point load warehouse: 60 kN/m²
  • 36 loading docks (including mechanical dock leveller, electrohydraulic)
  • 3 overhead doors
  • Floor level: DIN 18.202, table 3, rule 3
  • LED lighting (200 lux warehouse/expedition)
  • Sprinkler system
  • Separate air heating
  • BREEAM NL 'Excellent' 

Annehmlichkeiten

Km von nächstgrößerer Stadt

20

Parkplätze

411

Tankstelle

55

Km entfernt

54

The asset boasts excellent connectivity to various regions within the Netherlands, as well as to Germany and Belgium, thanks to its strategic location adjacent to the A73 and N570 highways.

Galerie

Detailansicht